Sign In | Join Free | My himfr.com
Home > Sinter HIP Furnace >

Double Door 6 MPa Sinter HIP Furnace For Cemented Carbide Dewaxing

Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Double Door 6 MPa Sinter HIP Furnace For Cemented Carbide Dewaxing from wholesalers
     
    Buy cheap Double Door 6 MPa Sinter HIP Furnace For Cemented Carbide Dewaxing from wholesalers
    • Buy cheap Double Door 6 MPa Sinter HIP Furnace For Cemented Carbide Dewaxing from wholesalers

    Double Door 6 MPa Sinter HIP Furnace For Cemented Carbide Dewaxing

    Ask Lasest Price
    Brand Name : Ruideer
    Model Number : 350*350*1200mm
    Certification : CE;ISO9001;ISO14001;OHSAS 18001;GB/T29490
    Price : Negotiable
    Payment Terms : L/C, T/T
    Supply Ability : 8 sets/month
    Delivery Time : 100-120 work days
    • Product Details
    • Company Profile

    Double Door 6 MPa Sinter HIP Furnace For Cemented Carbide Dewaxing


    350*350*1200-6 MPa sinter-HIP furnace with a single chamber and double door horizontal and periodic heating structure


    Equipment system:
    It mainly includes control system, heating system, positive and negative pressure dewaxing system, vacuum system, pressure sintering system, cooling water system, rapid cooling system, safety system and auxiliary system.


    Design standards:

    The cemented carbide pressure sintering furnace is a single chamber and double door horizontal and periodic heating structure,which is designed for easy handling and maintenance, the whole process is controlled automatically.It can realize full load continuous operation, 300 furnace times/year or 300 working days/year.It uses graphite element resistance heating (low voltage, high current) .In addition, there are multiple heating units, each of which controls the temperature separately.It equipped with fully automatic control function and safety interlock function.The whole process is automatically controlled, monitored, tracked and recorded by computer.The PLC, industrial computer (PC) control to realize the whole process of one-key start, real-time dynamic monitoring, computer will save temperature, pressure, vacuum and other parameters ,alarm interlocking is safe and reliable.


    General equipment requirements:
    The equipment is mainly used for dewaxing of cemented carbide (vacuum Ar carrier gas dewaxing and hydrogen micro-positive pressure dewaxing), vacuum sintering, partial pressure sintering, pressure sintering, rapid cooling and other processes.It meets the strict requirement of uniformity of furnace temperature and atmosphere in sintering process of cemented carbide.


    Technical parameters of equipment

    Service life of furnace shell

    20 years service life

    Furnace shell working time

    6000 (furnace/time)

    Effective working zone size

    350mm×350mm×1200mm

    Max.loading weight

    500kg

    Maximum design temperature

    1600℃(Under vacuum sintering conditions,drying the furnace 1600℃)

    Maximum working temperature

    1500℃

    (Under the vacuum and pressure condition.)

    Maximum design pressure

    60bar

    Maximum working pressure

    58bar

    Pumping speed


    The vacuum degree can reach 5Pa within 30min after the pump is started, and the limit vacuum value can reach 1Pa after pumping for 30min after reaching 5Pa

    (After drying the furnace,under the empty furnace, clean and cold state)



    Leakage rate


    ≤3Pa/h

    (Measuring the limit vacuum after drying the furnace, stop the operation of the pump group and start the test.Average within 3 hours in empty furnace, clean and cold state)



    Cooling time of loading full furnace


    When the furnace is fully loaded,the cooling time of sintering temperature from 1450℃ to 100℃ is less than or equal to 6 hours(water temperature ≤30℃,55bar≤pressure≤58bar)



    Filling high pressure argon gas


    It adopts intermittent stable inflation, inflation time can be set.The system accurately matches the relationship between charging volume and time to ensure the following of charging.



    Wax collecting rate


    ≥98%(10kg paraffin refined wax ,Ar negative pressure dewaxing ,three averages at most



    Pressurization time


    The pressurization time to 58Bar is less than 20 minutes,which can be set.(The gas resource is stable in the range of 80bar-100bar)



    After sales:

    1.Installation, Commissioning And Acceptance

    We do installation, commissioning and acceptance in buyer's plant.During the installation and commissioning period, the commissioning personnel shall be provided free of charge by the demander according to the staff standard.

    The equipment shipped to the buyer, the seller received the buyer's notification, both within a week to carry the equipment out of the box together, then check the equipment and all components according to the packing list . Including equipment accessories, spare parts and special tools, attached manual and technical documents, etc. It can be installed after the acceptance check of equipment.
    After installation and debugging, the equipment shall be accepted according to the technical accessories.


    2.Training

    When taking-over the Furnace to the customer, We will give a staff training to customer. The operating personnel of the customer should join to commission,test the furnace, when installing at customer’s company.
    This is practical operation training and practical maintenance training,and our technical personnel will telling the basic principle,equipment maintenance knowledge,And the common fault handling measures.We can training 2 ~ 3 workers. ( Training how to maintenance and operating.)


    3. Warranty period

    The warranty period of the equipment is 12 months, which starts from the date of installation and debugging of the supplier. Equipment failure happens, after-sales service personnel shall give solutions within 2 hours, after receiving the buyer's notification . If it is need to go to the site for treatment , operators dispatched by seller should arrive at the site within 48 hours after go aboard. In case of emergency,operators should arrive at the site within 48 hours after go aboard, and continue to make repairs until the fault is removed and the equipment returns to normal.


    Quality Double Door 6 MPa Sinter HIP Furnace For Cemented Carbide Dewaxing for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)