Sign In | Join Free | My himfr.com
Home > High Vacuum Furnace >

Max Temperature 1800℃ High Vacuum Furnace Low Energy Consumption Protecting Environment

Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Max Temperature 1800℃ High Vacuum Furnace Low Energy Consumption Protecting Environment from wholesalers
     
    Buy cheap Max Temperature 1800℃ High Vacuum Furnace Low Energy Consumption Protecting Environment from wholesalers
    • Buy cheap Max Temperature 1800℃ High Vacuum Furnace Low Energy Consumption Protecting Environment from wholesalers

    Max Temperature 1800℃ High Vacuum Furnace Low Energy Consumption Protecting Environment

    Ask Lasest Price
    Brand Name : Ruideer
    Certification : CE;ISO9001;ISO14001;OHSAS 18001;GB/T29490
    Price : 200000.00(USD)
    Payment Terms : L/C, T/T
    Supply Ability : 8 sets/month
    Delivery Time : 100-120 work days
    • Product Details
    • Company Profile

    Max Temperature 1800℃ High Vacuum Furnace Low Energy Consumption Protecting Environment

    Max Temperature 1800℃ High Vacuum Furnace Low Energy Consumption Protecting Environment


    Description:

    The high vacuum furnace is single-chamber, horizontal and periodic heating. It adopt low voltage and large current graphite heating element to heating, and it has multiple heating units, each unit controls the temperature separately. The whole process is automatically controlled, monitored, tracked and displayed and recorded by the computer.

    It including control system, heating system, vacuum system, cooling water system, rapid cooling system, auxiliary system and safety system.

    It adopt the structure of built-in graphite liner in insulation tube. In general, it meets the strict requirements of temperature uniformity and atmosphere uniformity in the sintering process of high-performance materials. The furnace structure design is advanced and reasonable, and it is easy to use and maintain.


    Vacuum pump: backing pump, Roots-type pump(slide valve pump, rotary vane pump, screw pump and so on can be selected for the backing pump, allowing customers to choose world-class brand products)


    Power supply: General standard is three phase five wire system AC380V±10% 50HZ.

    Control power supply:Single-phase AC210V-250V 50HZ design(Different countries and regions can be designed according to local grid standards)


    Temperature measurement mode: WRe5-26 thermocouple


    Technical parameters:


    Specifications

    RDE-GWL-5518

    Effective space(w* h * l)mm

    500*500*1800

    Max.Temperature

    1800℃
    Maximum load1500Kg

    Vacuum leakage rate:(Average in cold,empty,dry chamber in 3 hours)

    3Pa/h
    Extreme vacuum3×10-3Pa

    MAX working pressure

    100KPa

    Cooling period(Sintering temperature—100℃)

    480min

    Temperature control mode

    3-zone

    Functions:

    vacuum heating,heating flowing gas,Rapid cooling.

    Applications: For Non-metal ceramic, Precision Ceramic, Life ceramics, Industrial ceramics, Sic carbide


    Competitive Advantage:


    1. Compact structure, small occupation area, low energy consumption, rapid cooling speed, saving energy and protecting environment.

    2. Full range of sizes available,can be used in experimental research and development, Small and medium-sized enterprises as well as mass production. We can design the products according to customer’s special requirement.

    3. High automation level: one-button start, Double industrial PC operating system, mutually redundant, safe and reliable.

    4. The control system is full-automatic with data record &backup function, the operation system is more humanized, more powerful.

    5. The Insulation box is of good insulation effect, free of volatilization athigh temperature, with long life. It adopts “sandwich structure”and CFC material inside and outside with high strength, will be no deformation afteer many years use.

    6. Program has resume-heat-at-breakpoint function, no need to restart the program in case of short time power failure.

    7. Convenient service: If the customer has the demand may carry on the sintering product test in the Ruideer company site, and the company production site has the hot state pressure condition.

    8. Quick installation: The installation can be completed and put into production within 15 days when water, electricity and gas are in place.

    Product Tags:

    horizontal vacuum furnace

      

    sic furnace

      
    Quality Max Temperature 1800℃ High Vacuum Furnace Low Energy Consumption Protecting Environment for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)