Sign In | Join Free | My himfr.com
Home > Gas Pressure Sintering Furnace >

Optimal Performance Gas Pressure Sintering Furnace For Hard Metals Cermets PM Materials

Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Optimal Performance Gas Pressure Sintering Furnace For Hard Metals Cermets PM Materials from wholesalers
     
    Buy cheap Optimal Performance Gas Pressure Sintering Furnace For Hard Metals Cermets PM Materials from wholesalers
    • Buy cheap Optimal Performance Gas Pressure Sintering Furnace For Hard Metals Cermets PM Materials from wholesalers

    Optimal Performance Gas Pressure Sintering Furnace For Hard Metals Cermets PM Materials

    Ask Lasest Price
    Brand Name : Ruideer
    Model Number : 100 bar
    Certification : CE certificate, GB150, JB4732
    Price : USD 93,000-77,000,000
    Payment Terms : L/C, T/T
    Supply Ability : 7 sets / month
    Delivery Time : 5-8 months
    • Product Details
    • Company Profile

    Optimal Performance Gas Pressure Sintering Furnace For Hard Metals Cermets PM Materials

    Optimal Performance Gas Pressure Sintering Furnace For Hard Metals, Cermets And Other PM-Materials

    Using latest technologies results in the improved and lasting quality of the sintering products. Substantial savings in process time leads to much higher productivity and cost reduction.

    Strength of a material is its ability to withstand this applied load without failure or plastic deformation. For tensile stress, the capacity of a material or structure to withstand loads tending to elongate is known as ultimate tensile strength (UTS). Yield strength or yield stress is the material property defined as the stress at which a material begins to deform plastically whereas yield point is the point where nonlinear (elastic + plastic) deformation begins. In case of tensional stress of a uniform bar (stress-strain curve), the Hooke’s law describes behaviour of a bar in the elastic region. The Young’s modulus of elasticity is the elastic modulus for tensile and compressive stress in the linear elasticity regime of a uniaxial deformation and is usually assessed by tensile tests.

    After sinterinng in RDE'S furnace, density, strength, durability and hardness of hard metals would improve a lot, meeting highest demands.

    Sintering space80-450L
    Working temperature1600℃(maximum working temperature)
    1550℃(actual working temperature )

    Pumping speed

    The vacuum degree can reach 5Pa within 30min after the pump is started, and the limit vacuum value can reach 1Pa after pumping for 30min after reaching 5Pa

    (After drying the furnace, under the empty furnace, clean and cold state.)


    Leakage rate

    ≤3Pa/h

    (Measuring the limit vacuum after drying the furnace, stop the operation of the pump group and start the test. Average within 3 hours in empty furnace, clean and cold state)


    Cooling speed


    Empty furnace. The cooling time of cooling temperature from 800℃ down to 100℃ just cost less or equal 3 hours.(water temperature≤28℃, 2bar≤water pressure≤3bar)

    Cooling speed

    The inner furnace is equipped with rapid cooling fan and cooling water realize rapid cooling.
    Heating rod materialGraphite
    Temperature control modeThree zone temperature control independently
    Heating up speed

    Empty furnace heating up≤5℃



    Heating power


    It is about 480KVA

    UPS guarantee time


    It can power the indicator lights and control the furnace when the power goes out,the time is more than or equal 80 minutes.
    Quality Optimal Performance Gas Pressure Sintering Furnace For Hard Metals Cermets PM Materials for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)