Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | Ruideer |
Model Number : | 500*500*1800 |
Certification : | CE;ISO9001;ISO14001;OHSAS 18001;GB/T29490 |
Price : | Negotiable |
Payment Terms : | L/C, T/T |
Supply Ability : | 8 sets/month |
Delivery Time : | 100-120 work days |
500*500*1800 single-chamber with horizontal structure sinter-HIP furnace
Main application
It can be used for high-performance carbide materials (positive
negative pressure dewaxing, forming agent for paraffin or PEG) and
vacuum sintering and low pressure argon gas static pressure
sintering sintering, high pressure and low pressure argon dynamic
pressure sintering, high temperature and high pressure conditions
of argon charged cooling/insulation/warming mature equipment as the
main function of batch production.Applicable to the field of
cemented carbide, ceramics and other products.
Total structure
1. The pressurized sintering furnace is single-chamber, horizontal
and periodic heating, heated by low-voltage and high-current
graphite heating elements, and has multiple heating units, each of
which separately controls the temperature.The whole process is
controlled by computer automation, monitoring, tracking, fault
self-diagnosis simulation display and record.
2. The pressurized sintering furnace includes control system, heating system, degreasing system (positive and negative pressure degreasing system), vacuum system, partial pressure sintering system, pressurized sintering system, cooling water system, rapid cooling system, auxiliary system and safety system.On the whole, it meets the strict requirements of high performance cemented carbide in the sintering process for the uniformity of furnace temperature and atmosphere.The furnace structure design is advanced and reasonable, which is convenient for operation and maintenance.Main supporting components (control elements, sensors, graphite heating element, thermocouple, main control valve, vacuum pump, etc.) have the international advanced level, can adapt to long-term, stable, reliable mass production requirements.At the same time, the equipment also meets the national requirements for energy conservation and environmental protection.
Technical indexes
Service life of furnace shell | 20 years |
Furnace shell working time | 6000(furnace/time) |
Effective working zone size | ≥500mm×500mm×1800mm |
Max.loading weight | 1500kg(The load depends on the type of product) |
Maximum design temperature | 1600℃ (Under vacuum sintering conditions,heating up the furnace to 1600℃) |
Maximum working temperature | 1550℃(Under the vacuum and pressure condition) |
Maximum design pressure | 100bar |
Maximum working pressure | 98bar |
Pumping speed | The vacuum degree can reach 5Pa within 30min after the pump has started, and the limit vacuum value can reach 2Pa within 30 minutes pumping state after the vacuum limit reaching 5Pa (After heating up the furnace,under the empty furnace, clean and cold state) |
Maximum heating rate | 5-7℃/min (In the case of vacuum and empty furnace, the chamber temperature shall be raised to 1450℃, and the temperature shall be kept for 40 minutes during the process of 600℃, 1000℃ and 1200℃.) |
Temperature control mode | 4 zone control temperature |
Leakage rate | ≤3Pa/h |
Cooling time of loading full furnace | When the furnace is fully loaded,the cooling time of sintering temperature from 1450℃ to 100℃is less than or equal to 7 hours(water temperature ≤26℃,90bar≤pressure≤95bar) |
Filling high pressure argon gas | It adopts intermittent stable inflation, inflation time can be set.The system accurately matches the relationship between charging volume and time to ensure the following of charging. |
Wax collecting rate | ≥98%(10kg paraffin refined wax,Ar negative pressure dewaxing ,three averages at most. |
Pressurized time | The pressurization time to 98Bar is less than 30 minutes,which can be set.(When the gas resource is stable in the range of 120bar,it can be pressurized to the pressure value of according process requirement.) |
Uninterrupted power supply guarantee time | It can power the indicator lights and control the furnace when the power goes out,the time is more than or equal 120 minutes. |
Heat zone temperature uniformity | In the process of vacuum and pressure sintering,the temperature uniformity of pressure(90bar)1450℃: fill with high pressure gas at maximum allowable speed,temperature fluctuation≤±5℃ |
After sales:
1. Installation, Commissioning and Acceptance
We do installation, commissioning and acceptance in buyer's plant.During the installation and commissioning period, the commissioning personnel shall be provided free of charge by the demander according to the staff standard.
The equipment shipped to the buyer, the seller received the buyer's
notification, both within a week to carry the equipment out of the
box together, then check the equipment and all components according
to the packing list . Including equipment accessories, spare parts
and special tools, attached manual and technical documents, etc. It
can be installed after the acceptance check of equipment.
After installation and debugging, the equipment shall be accepted
according to the technical accessories.
2. Training
When taking-over the Furnace to the customer, We will give a staff
training to customer. The operating personnel of the customer
should join to commission,test the furnace, when installing at
customer’s company.
This is practical operation training and practical maintenance
training,and our technical personnel will telling the basic
principle,equipment maintenance knowledge,And the common fault
handling measures.We can training 2 ~ 3 workers. ( Training how to
maintenance and operating.)
3. Warranty period
The warranty period of the equipment is 12 months, which starts from the date of installation and debugging of the supplier. Equipment failure happens, after-sales service personnel shall give solutions within 2 hours, after receiving the buyer's notification . If it is need to go to the site for treatment , operators dispatched by seller should arrive at the site within 48 hours after go aboard. In case of emergency,operators should arrive at the site within 48 hours after go aboard, and continue to make repairs until the fault is removed and the equipment returns to normal.
![]() |